Parshall Flume Installation:
Site survey and leveling
Installation of upstream support wall
Upstream support wall and excavated holes for downstream and middle support walls
Fence posts and concrete were installed within cinder blocks of support walls for added support
First unexpected rain event
Clearing riparian vegetation for watershed calibration
Flumes were anchored with fence posts and 1/4" stainless steel cable
Flumes were leveled and flanked by concrete walls to prevent erosion around flume edges
Flumes were backfilled and seeded around edges and a concrete approach was poured to prevent scour beneath the flume
Stilling Well/Pressure Transducers:
Pressure Transducers and Downloading Hardware
|
|