Parshall Flume Installation:

Site survey and leveling

 

 

Installation of upstream support wall

 

 

Upstream support wall and excavated holes for downstream and middle support walls

 

 

Fence posts and concrete were installed within cinder blocks of support walls for added support

 

 

First unexpected rain event

 

 

Clearing riparian vegetation for watershed calibration

 

 

Flumes were anchored with fence posts and 1/4" stainless steel cable

 

 

Flumes were leveled and flanked by concrete walls to prevent erosion around flume edges

 

 

Flumes were backfilled and seeded around edges and a concrete approach was poured to prevent scour beneath the flume

 

Stilling Well/Pressure Transducers:

 

Pressure Transducers and Downloading Hardware